EFT Rudnik i Termoelektrana Stanari d.o.o.
Informations
Company profile
EFT Group is engaged in trade and investment in the energy sector, especially in the western, central and south-eastern Europe. Through trade, investment in new energy production facilities and construction of new transmission capacity, EFT is leader in development of the electricity market in South East Europe.
Thermal power plant
In May 2010, EFT and Dongfang Electric Corporation signed the EPC (Engineering, Procurement and Construction) contract to build the 300 MW thermal power plant in the vicinity of the Stanari mine. Key parameters of the TPP Stanari technical concept are:
- Single unit design
- Gross power capacity 300 MW
- Circulating fluidised bed boiler with subcritical steam parameters
- Single reheat steam turbine
- Air Cooled Condenser
- 400 kV grid connection.
There are two technical aspects of TPP Stanari that distinguish it from similar coal fired power plants in the region: Circuating Flluidised Bed (CFB) Boiler and Air Cooled Condenser (ACC).
Mine
The excavation of overburden at the Raškovac open pit is effected through a combination of continuous and discontinuous operation. The existing continuous excavating system (CES) has been fully rehabilitated and modernised in 2005 and 2006. The CES consists of bucket wheel excavator C-700, bandwagon BRs 1400, belt conveyor system 1400 mm, overburden spreader ARs 1400 and dragline excavator ES 5/45. In addition to the CES system, a fleet of hydraulic shovel excavators and dumper trucks is used for the removal of overburden layers. In 2006 the overburden depositing has been modified from external to internal depositing, which substantially improves the landscape of already excavated areas and rationalises the operation costs. The recultivation of external overburden deposit area commenced in 2005, thus significantly reducing the environmental impact.
Coal layers are excavated by hydraulic shovel excavators and transportation to the coal processing plant is done by trucks. The coal is classified in the processing plant according to size into the following classes:
- Class 1 – 200-1200 mm
- Class 2 – 60-120 mm
- Class 3 – 40-80 mm
- Class 4 – 0-40 mm
Coal transportation can be done by trucks or by railway. Apart from the above main equipment, an entire fleet of ancillary equipment is used at the mine: bulldozers, graders, pipe-layers and various kinds of off-road vehicles.
- Director:
- Savo Mirković
- Phone:
- +387 53 209 930
- Fax:
- +387 53 209 990
- Website:
- EFT Rudnik i Termoelektrana Stanari
- Address:
- Stanari bb, 74208 Stanari, Bosna i Hercegovina